July 13, 2008

Worked all day on the lane yesterday and got a lot done. Finished framing almost all of the sides, got half of the top bedding finished, called it a day, and then the floods came. Yep, 2 inches of water flooded my basement. Never had a drop down there before and now this happens. My wife helped me shim the entire lane off the floor and out of the water. We spent all day Sunday cleaning up and surveying the damage. Hopefully we got the lane bedding out of the water quick enough to avoid it being ruined. My wife says this is just a trial and to keep working towards my dream, so I will.

Leave a Reply